Water Supply on the Peninsula

From EcuaWiki
Revision as of 05:11, 22 October 2026 by Este-fan (talk | contribs) (New page from the Santa Elena PDOTs (2015–2027))
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Water on the Santa Elena Peninsula comes almost entirely from outside the province. The peninsula gets about 300 mm of rain a year, its rivers run only in the rainy season, and Salinas has no groundwater at all. Every tap in Santa Elena, La Libertad and Salinas depends on one chain of canals and pumps that brings water from the Daule River in Guayas.

How the water gets here

Step What happens
1. Daule River The Daule-Peripa dam upstream regulates the river.
2. Daule pumping station, canals and tunnel 27 km + 4 km of canal and a tunnel of almost 7 km carry water to the ChongĂłn reservoir. Working since 1999.
3. ChongĂłn reservoir About 280 million mÂł of storage.
4. ChongĂłn pumping station Lifts the water 62 m over the coastal hills; 9.2 mÂł/s installed, only about half in use.
5. Canal Chongón–Sube y Baja and the Río Bejuco Part of the trip runs in a natural riverbed. At the Bejuco weir, the Chongón–San Vicente branch splits off to irrigate the north (Las Balsas valley and the San Vicente reservoir).
6. El AzĂșcar reservoir Built in the 1960s. Its water surface shrank from 660 ha in 1998 to 158 ha in 2016 because of silt and water hyacinth.
7. Canal AzĂșcar–RĂ­o Verde and San Rafael reservoirs Raw water is pumped from here to the treatment plant. About 13,000 ha of farms are irrigated along the canals, 92% of it private land.
8. Atahualpa treatment plant (Aguapen EP) 940 l/s, about 81,000 mÂł a day: chlorination, coagulation, settling, filtering and a final chlorination.
9. Central reservoir (12,000 mÂł) Lines run to the Salinas and Santa Elena tanks (5,000 mÂł each), to Barbasco in Punta Blanca, and to Anconcito.
10. Your tap Santa Elena, La Libertad, Salinas, José Luis Tamayo, Anconcito, Atahualpa, Ancón, El Tambo, Prosperidad and villages along the road to Ayangue.

If any link fails — a pump, a canal or the Atahualpa plant — all three cities lose water at once.

Who runs it

  • Raw water and irrigation: built by CedegĂ© and run by Senagua since 2009 (now part of the Environment and Water Ministry).
  • Drinking water, sewers and wastewater: Aguapen EP, the joint public company of the three municipalities. It began as a private company on 14 December 1999 and became a municipal public company in 2012–2013. It has more than 100,000 customers. Bills can be paid as described in Paying Utilities; the water bill now also includes the rubbish collection fee.

How many homes are connected

  • Santa Elena canton: 89.1% of homes (2022). By locality, coverage of the network ranges from 75% of the city's area down to 45% in Punta Blanca and 30% in Villingota.
  • Salinas: share of each parish's area with piped water — Salinas 72%, JosĂ© Luis Tamayo 76%, Anconcito 45%.
  • Supply is intermittent at the edges of the network and can be rationed in droughts and in the busy high season (December–April). Many residents drink bottled water.

The north coast is different

The Ruta del Spondylus villages are not on this network. Community water boards (juntas de agua) pump groundwater:

  • Junta Regional de OlĂłn: OlĂłn, Curia, San JosĂ©, Las Nuñez, La Entrada
  • Junta Regional de Manglaralto: Montañita, RĂ­o Chico, Cadeate, San Antonio, Libertador BolĂ­var, Manglaralto
  • Junta Regional de Valdivia: San Pedro, Valdivia, Sinchal, Barcelona, Carrizal
  • Dos Mangas has its own board; Colonche parish has several boards and about a dozen small committees.
  • Inland villages such as Julio Moreno and SacachĂșn depend on tanker trucks.

Heavy pumping is lowering the water table and its quality. New modular treatment plants for Colonche–Palmar–Ayangue and the Manglaralto villages have been proposed.

See also

Sources: PDOT Provincia de Santa Elena 2015–2019 (pp. 214–217) and 2019–2023 (pp. 122–124); PDOT cantón Santa Elena 2023–2027 (pp. 96–105); PDOT Salinas 2023–2027 (pp. 86, 138–140).